Skip to content

Suspension

10 guides in this section.

Shock absorber inspection

NB shock inspection with concrete leak/wear checkpoints, bounce-control tests, and replacement decision rules before handling degrades.

Difficulty:
Intermediate
Time:
30-75 min

Ball joint inspection

NB front ball-joint inspection with clear wheel-play tests, pry-bar confirmation, and practical replace-vs-monitor criteria.

Difficulty:
Intermediate
Time:
45-90 min

Sway bar link inspection

Inspect Mazda MX-5 NB sway bar end links for play, noise, bushing wear, and incorrect preload/installation before deciding on replacement.

Difficulty:
Intermediate
Time:
30-60 min

Suspension bushing inspection

NB suspension-bushing inspection with exact crack/separation checks, pry-bar movement criteria, and selective-vs-full refresh decision guidance.

Difficulty:
Intermediate
Time:
45-90 min

Shock absorber replacement

NB shock absorber replacement planning and procedure with spring-compression safety, side-to-side replacement rules, and post-install alignment checks.

Difficulty:
Advanced
Time:
3-6 hours

Coil spring inspection & replacement

NB coil spring inspection and replacement workflow with strict spring-compressor safety, pair replacement guidance, and post-install ride-height/alignment checks.

Difficulty:
Expert
Time:
3-7 hours

Strut top mount/bearing inspection & replacement

NB strut top mount/bearing inspection and replacement with spring-compressor safety, clunk diagnosis logic, and post-install alignment checks.

Difficulty:
Expert
Time:
3-6 hours

Wheel bearing inspection & replacement (front/rear)

NB wheel-bearing inspection and replacement planning with strict noise-diagnosis checks, play verification, and year/VIN FSM-gated replacement procedures.

Difficulty:
Expert
Time:
2-8 hours

Control arm replacement (upper/lower)

NB control arm replacement workflow with ball-joint/bushing decision points, safe disassembly order, and mandatory post-repair alignment checks.

Difficulty:
Expert
Time:
3-8 hours

Sway bar bushing replacement

NB sway bar bushing replacement workflow with bar-diameter verification, bracket condition checks, and post-service noise/handling validation.

Difficulty:
Intermediate
Time:
1-3 hours