Skip to content

Appendices

2 guides in this section.

Routine Log Sheets (for tracking maintenance)

A practical MX-5 NB logging system with specific fields, interval tracking, and fault-history structure so maintenance decisions are evidence-based rather than guesswork.

Difficulty:
Beginner
Time:
20-40 min setup, 2-5 min per service entry

Fluids & Consumables (with specifications)

MX-5 NB fluid/spec quick-reference with concrete capacities, purchase quantities, and known-good product examples so you can buy once and service confidently.

Difficulty:
Intermediate
Time:
30-60 min setup, ongoing updates per service